Projects in Malaysia

With a team of professionals in their respective fields, armed with the solid experiences gained over these many years, constantly striving to stay at the forefront of the current technologies in order to stay ahead of our nearest competitors and seek to provide best products and services to our customers. Our long track records are the best testament to our claims.

Malaysia

Our major involvement in the infrastructures of the country which include the North-South Highway (PLUS) through the length and breadth of the country such as DUKE, ELITE, NKVE, EKVE, LPT, MEX, EDL, Karak Expressway, DASH, SUKE and so on, the KLIA2 Airport Runway, Johor Bahru Airport, Kuala Terengganu Airport, Sultan Ismail Petra Airport Kota Bahru, the Cendering Fishing Port and undertaken all types of buildings, pipe laying and loads of related projects.

Here we are today

2020
  • Projek Penswataan Lebuhraya Bertingkat Sungai Besi – Ulu Kelang Section A – Sungai Besi to Cheras. Package: CA 1 (CH0 to CH2400).

 

2018
  • Cadangan Kerja-Kerja Menaiktaraf MRR2, Persimpangan Taman Melati dan Kerja-Kerja Berkaitan Secara Reka dan Bina.
  • Proposed Development of Langat 2 Water Treatment Plant and Water Reticulation System in Selangor Darul ehsan / Wilayah Perskutuan Kuala Lumpur (LANGAT 2 WTP and Water Reticulation – Phase 1) Package 2A – Construction and Completion of 1130 MLD Langat 2 Water Treatment Plant.
  • Projek Penswataan Lebuhraya Bertingkat Damansara – Shah Alam (DASH) – CB1 – Construction and Completion of Mainline and Other Associated Works From CH. 10350 to CH. 12453.
2017
  • Duta – Ulu Kelang Expressway (DUKE) Phase 2, Section 1 – Tun Razak Link (At Grade).
  • East Klang Valley Expressway (EKVE) Project Package 3 – Proposed Upgrading Existing Jalan Ukay Perdana & Kg. Pasir Interchange at MRR2 – Pavement Works.

 

2016
  • Projek Mass Rapid Transit Lembah Kelang – Jajaran Sungai Buloh – Kajang Constrcution and Completion of Viaduct Guideway and Other Associated Works From Bandar Tun Hussein Onn to Taman Mesra (Package V7) Construction and Completion of Civil, Sub-Structure and other Related Works.
  • The Construction, Completion and Maintenance of Earthwork, Roadworks, Drainage, Water Supply, Sewage and Associated Works for Cadangan Pembangunan Bercampur Fasa 1 (Perumahan dan Perdagangan) Di Atas Lot PT37380, Mukim Rawang dan Lot 1048 Bandar Kundang, Daerah Gombak, Selangor Darul Ehsan utnuk Tetuan Pinggir Mentari Sdn. Bhd.

 

2015
  • Sub-Contract for Road Works (Premix) Provisional for Mass Rapid Transit Lembah Kelang Jajaran Sungai Buloh – Kajang Package DPT. 1 : Construction and Completion of Sungai Buloh Maintenance Depot, Administration Building, External Works and Other Associated Works.
  • Pavement Rehabilitation 2015 Along The Grand Sepadu Highway.

 

2013
  • Proposed Development of KLIA 2 and Associated Works at KL International Airport Sepang, Selangor (“The Project”). Supply Labour and Machinery and Premix Materials for Pavement Works (“The Sub-Contract”).
  • Proposed Development of KLIA 2 and Associated Works at KL International Airport Sepang, Selangor (“The Project”). Supply Labour and Machinery for Proof Rolling Works (“The Sub-Contract Works”).

 

2012
  • Proposed Development of KLIA 2 and Associated Works at KL International Airport Sepang, Selangor (“The Project”). Supply Labour and Machinery Sub-Base and Cement Treated Base Pavement Works (“The Sub-Contract Works”).

 

2011
  • Proposed Eastern Dispersal Link (EDL) Johor Bharu, Johor Darul Takzim, Sub-Contract for Construction and Completion of Pavement Works on Bridge’s Deck for Mainline, Ramp A, B, C, D.

 

2010
  • Project Lebuhraya Pantai Timur Fasa 2 Pakej 10 Dari Bukit Besi ke Bukit Payung dan Bukit Payung Spur Road Sub-Contract for Pavement Works Package 10A, 10B & 10C (CH99+700 to CH148+298).
  • Membina Lebuhraya Persisir Pantai Johor Bahru ke Nusajaya, Hohor Darul Takzim. Construction and Completion of Infrastructure Works, Ground Improvement, Bridge Structures, Drainage, Roadworks Landscape and Associated Works (Section 2 – CH2400 to CH9500).
  • Projek Membina Persimpangan Bertingkat Dari Istana Negara Baru di Lot 3952, Jalan Duta Kuala Lumpur ke Jalan Duta.
  • Manaiktaraf Lapangan Terbang Sultan Ismail Petra Kota Bharu, Kelantan Darul Naim.

 

2020
  • Projek Penswataan Lebuhraya Bertingkat Sungai Besi – Ulu Kelang Section A – Sungai Besi to Cheras. Package: CA 1 (CH0 to CH2400).
  • 2018
  • Cadangan Kerja-Kerja Menaiktaraf MRR@, Persimpangan Taman Melati dan Kerja-Kerja Berkaitan Secara Reka dan Bina.
  • Proposed Development of Langat 2 Water Treatment Plant and Water Reticulation System in Selangor Darul ehsan / Wilayah Perskutuan Kuala Lumpur (LANGAT 2 WTP and Water Reticulation – Phase 1) Package 2A – Construction and Completion of 1130 MLD Langat 2 Water Treatment Plant.
  • Projek Penswataan Lebuhraya Bertingkat Damansara – Shah Alam (DASH) – CB1 – Construction and Completion of Mainline and Other Associated Works From CH. 10350 to CH. 12453.
  • 2017
  • Duta – Ulu Kelang Expressway (DUKE) Phase 2, Section 1 – Tun Razak Link (At Grade).
  • East Klang Valley Expressway (EKVE) Project Package 3 – Proposed Upgrading Existing Jalan Ukay Perdana & Kg. Pasir Interchange at MRR2 – Pavement Works.
  • 2016
  • Projek Mass Rapid Transit Lembah Kelang – Jajaran Sungai Buloh – Kajang Constrcution and Completion of Viaduct Guideway and Other Associated Works From Bandar Tun Hussein Onn to Taman Mesra (Package V7) Construction and Completion of Civil, Sub-Structure and other Related Works.
  • The Construction, Completion and Maintenance of Earthwork, Roadworks, Drainage, Water Supply, Sewage and Associated Works for Cadangan Pembangunan Bercampur Fasa 1 (Perumahan dan Perdagangan) Di Atas Lot PT37380, Mukim Rawang dan Lot 1048 Bandar Kundang, Daerah Gombak, Selangor Darul Ehsan utnuk Tetuan Pinggir Mentari Sdn. Bhd.
  • 2015
  • Sub-Contract for Road Works (Premix) Provisional for Mass Rapid Transit Lembah Kelang Jajaran Sungai Buloh – Kajang Package DPT. 1 : Construction and Completion of Sungai Buloh Maintenance Depot, Administration Building, External Works and Other Associated Works.
  • Pavement Rehabilitation 2015 Along The Grand Sepadu Highway.
  • 2013
  • Proposed Development of KLIA 2 and Associated Works at KL International Airport Sepang, Selangor (“The Project”). Supply Labour and Machinery and Premix Materials for Pavement Works (“The Sub-Contract”).
  • Proposed Development of KLIA 2 and Associated Works at KL International Airport Sepang, Selangor (“The Project”). Supply Labour and Machinery for Proof Rolling Works (“The Sub-Contract Works”).
  • 2012
  • Proposed Development of KLIA 2 and Associated Works at KL International Airport Sepang, Selangor (“The Project”). Supply Labour and Machinery Sub-Base and Cement Treated Base Pavement Works (“The Sub-Contract Works”).
  • 2011
  • Proposed Eastern Dispersal Link (EDL) Johor Bharu, Johor Darul Takzim, Sub-Contract for Construction and Completion of Pavement Works on Bridge’s Deck for Mainline, Ramp A, B, C, D.
  • 2010
  • Project Lebuhraya Pantai Timur Fasa 2 Pakej 10 Dari Bukit Besi ke Bukit Payung dan Bukit Payung Spur Road Sub-Contract for Pavement Works Package 10A, 10B & 10C (CH99+700 to CH148+298).
  • Membina Lebuhraya Persisir Pantai Johor Bahru ke Nusajaya, Hohor Darul Takzim. Construction and Completion of Infrastructure Works, Ground Improvement, Bridge Structures, Drainage, Roadworks Landscape and Associated Works (Section 2 – CH2400 to CH9500).
  • Projek Membina Persimpangan Bertingkat Dari Istana Negara Baru di Lot 3952, Jalan Duta Kuala Lumpur ke Jalan Duta.
  • Manaiktaraf Lapangan Terbang Sultan Ismail Petra Kota Bharu, Kelantan Darul Naim.